A recent In-house built 40ft PES Containerised Substation for an 11Kv Gas Generation Project.


This Substation was designed in 2 sections; The first being a fully ventilated, bunded Midel Cooled Transformer Compound. The second a Mains 10 panel 11Kv Switchboard – complete with G99 and Generator Protection Relays, Class X CT’s, 5 Limb VT’s and Battery trip unit. The Substation was also treated with Anti-condensation finish, before being Thermally lined and Fireproofed, Supplied with external LED PIR lighting, and Dehumidifier.


Through years of providing reliable and cost effective solutions we have built a wealth of experience building Containerised Solutions.


We are able to design, build and supply Containerised Substations to meet a broad range of applications including Tunnelling, Solar, Wind, Generation as well as standard applications such as temporary substations.


Our Containerised Substations can be fully built, tested and pre-commissioned prior to arriving to site, providing a ‘plug and play’ option for electrical distribution, saving both time and cost onsite in comparison to using a GRP / Prefabricated Enclosure.


If you would like any further information on our Containerised Substations please don't hesitate to contact us.


VISIT US

Power Engineering Services Ltd
Unit A, Tong Road Industrial Estate
Amberley Road
Wortley
Leeds, LS12 4BD

 

CALL US
EMAIL US

© 2020 Power Engineering Services Ltd