Supporting Site Expansions with Specialist Solutions

Power Engineering Services were able to provide the following Equipment and Installation Package to a client wishing to expand production in their existing factory.

We provided the following HV Package:

• Long and Crawford Busbar End Cable Box.

• PES Refurbished Rn2c Ringmain Unit.

• PES Refurbished Hermetically Sealed Transformer, complete with PRD.

• Close Coupled New multiple way LV Distribution Unit.

• Galvanised Bund Tank with Oil Separation Unit.

• Substation Fenced Compound.

• Complete Site Installation Package, including; High level Cable Installation, HV+LV Cabling and Terminations and Onsite Testing and Commissioning.

The installation was supplied fully tested, certified and guaranteed, complete with 24 months Warranty, providing peace of mind over the Installation.

By combining Quality Refurbished Equipment, Highly Specified New Distribution Equipment and a Professional Installation Package we are able to offer a complete, cost effective and ‘Turnkey’ solution to Electrical Distribution.

If you would like any further information please contact us on 0113 2581083 or send an email to info@pesleeds.co.uk and a member of our team will be available to help.