PES engineer at work in the transformer restoration bay, Leeds

Issue 01 — 09.26

A new site.

A new site.

Does not need a new transformer.

Does not need a new transformer.

A new transformer is 12 to 30 weeks from order. A restored one leaves Leeds in four to six.

A new transformer is 12 to 30 weeks from order. A restored one leaves Leeds in four to six.

In stock

What a new connection needs.

What a new connection needs.

What a new connection needs.

Often already exists.

Often already exists.

Restored transformers, switchgear and monoblocks, LV pillars and terminals, tested before they leave. Spares and HV consumables on the shelf. Where new is the answer, we supply that too: battery tripping units built here, CORE transformers, special transformers built to order, and OEM equipment. Tell us the rating and the spec. We will tell you what is on the floor.

Restored transformers, switchgear and monoblocks, LV pillars and terminals, tested before they leave. Spares and HV consumables on the shelf. Where new is the answer, we supply that too: battery tripping units built here, CORE transformers, special transformers built to order, and OEM equipment. Tell us the rating and the spec. We will tell you what is on the floor.

Index

CORE distribution transformer by PES, finished and tested in Leeds
CORE distribution transformer, radiator side

CORE by PES

Distribution transformers

Dispatch

Weeks, not months.

PES battery tripping unit, front panel
PES battery tripping unit, door closed

BTU by PES

Battery tripping units

Build

4–6 weeks

Restored distribution transformer at PES works, Leeds
Restored transformer, rear view showing radiators

Restored transformers

Transformers

Dispatch

4–6 weeks

Restored ring main unit at PES, Leeds
Restored HV switchgear, side view

Restored switchgear

Switchgear

Dispatch

4–6 weeks

Restored LV pillar at PES, Leeds
Restored LV pillar, second view

Restored LV pillars

LV Pillars

Dispatch

4–6 weeks

DILO SF6 gas service cart at PES, Leeds
DILO SF6 service cart, side view

SF6 by PES

Gas handling

Appointed

UK service partner

Restored transformer and LV switchgear for iDNO adoption, PES x Eclipse
PES x Eclipse restored equipment, second view

PES x Eclipse

Restored assets, adopted

Warranty

Up to 36 months

PES grid connection works, NERS accredited ICP
Grid connection site, second view

ICP

NERS accredited connections

Accreditation

NERS, all six GB DNOs

Private HV network substation designed and built by PES
Private network equipment installed by PES

Private networks

Design, build, maintain

Scope

Design to energisation

HV switchgear spares and protection relays held in stock at PES
Switchgear spares and relays, second view

Spares

Components

Dispatch

Ex stock

CORE distribution transformer by PES, finished and tested in Leeds
CORE distribution transformer, radiator side

Equipment supply

New and OEM equipment

Scope

New, to spec

TELL US WHAT YOU NEED. WE WILL TELL YOU WHAT IT TAKES. INCLUDING WHEN THE ANSWER IS NEW.

LESS WASTE.

MORE USE.